Servers, liquid cooling, power and build services for AI compute centers. Use the free Design Tools calculators to size your facility, then request an engineer-backed quote — project-based pricing, no retail markup.
Ask questions and share experience on GPU racks, liquid cooling, power design, fire protection and vendor selection — with the engineers and builders shipping AI data centers.
ZhitingZhiting Blockset Switchgear Cabinet (1600 / 3150 / 4000 A)
ZhitingZhiting ZT-SPDC Integrated UPS Distribution Panel (30–180 kVA)
ZhitingZhiting Power Distribution Panel (10–630 A)
ZhitingZhiting ZT-RM Series Modular UPS (60–600 kW)
See all 39 →
Liquid Cooling
53
AurasAuras CPU & DIMM Cold Plate Module
AVCAVC CDU135-LTA-RW Liquid-to-Air CDU (72 kW)
ZhitingZhiting Rack Manifold (Stainless Steel, Custom Port Count)
ZhitingZhiting Brazed Plate Heat Exchanger for CDU
See all 53 →
Chillers
28
Dunham-BushDunham-Bush WCFX-RH Water-Cooled Screw Chiller
Dunham-BushDunham-Bush ACDS Air-Cooled Scroll Chiller
ZhitingZhiting Air-Cooled Magnetic Bearing Chiller
ZhitingZhiting Screw Chiller for Data Center
See all 28 →
Heat Rejection
24
ZhitingZhiting Adiabatic Dry Cooler (500–1200 kW)
Dunham-BushDunham-Bush DBCTR Crossflow Cooling Tower
Dunham-BushDunham-Bush LSBC Air-Cooled Condenser & Fluid Cooler
ZhitingZhiting Modular Dry Cooler
See all 24 →
Containerized Micro-Module
34
ZhitingZhiting Infinity Series 20ft Containerized Data Center - Standard
ZhitingZhiting AI Data Center Container (Air Cooling)
Schneider ElectricSchneider Electric EcoStruxure Modular Power Skid
RittalRittal DataCube RDC Containerized Data Center
See all 34 →
Racks & Enclosures
16
NVIDIANVIDIA GB300 NVL72 Liquid-Cooled AI Rack
VertivVertiv NetShelter Server Rack (42U / 47U)
ZhitingZhiting LS Series Server Rack (42U / 47U)
ZhitingZhiting Liquid Cooled Rack (600 / 800 mm)
See all 16 →
Rack, servers, power distribution, UPS/battery and liquid cooling pre-integrated in a standard container module — deployed in weeks, scaled by the container.
Sources: iMasons State of the Digital Infrastructure Industry 2026 (capacity by region); BloombergNEF, Sep 2025 (sites under active construction); Cushman & Wakefield Global Data Center Market Comparison 2026 (grid connection waits); JLL EMEA Data Centre Report, Mar 2026. Figures are rounded and reflect different reporting scopes and cut-off dates.
How the live figures work. Snapshot taken 2026-09-10. Headline and regional numbers are extrapolated from the published annual growth rates (+22%/yr under construction, +18%/yr pipeline, +12%/yr sites) and recomputed continuously, so they stay current between report releases. The snapshot is re-anchored automatically each month; recalibrated recently.
Free calculators to size your compute, power and cooling before you buy.
Open the tools → 💬Ask engineers and builders about GPU racks, liquid cooling, power and vendors.
Join the discussion → 🎓One-on-one technical consultation for sizing and design questions.
Talk to us → 🗂️Explore power distribution, racks and liquid-cooling lines system by system.
Browse systems →
📘STARTER · 6 MODULES
Compute, GPU racks and the end-to-end build blueprint — the foundations of any AI facility.
Start course →
❄️INTERMEDIATE · 5 MODULES
How CDUs, cooling towers and chillers work together to reject heat at 100kW+ per rack.
Start course →
⚡INTERMEDIATE · 5 MODULES
UPS, Li-ion battery and generator architectures sized for multi-megawatt AI loads.
Start course →
📦ADVANCED · 4 MODULES
One container, a full compute pod: racks, power and cooling pre-integrated, deployed in weeks.
Start course →