A line-by-line cost model for a behind-the-meter gas plant in Canada: fuel, TIER carbon, O&M, capital recovery and the provincial levy, in CAD, plus the four feasibility gates and the risk register that decides whether the project survives.
AESOAlbertabehind-the-meterCanadacost accountingdata center powerfeasibilitynatural gasTIER
Above 1,000 m air density falls fast: servers lose 7 C of inlet allowance by Mexico City, turbo gensets give up 12.5%, UPS 6%, switchgear needs a 1.28x BIL correction - and open tower pumps lose 3 m of NPSH. Full derating stack with worked numbers for a 2 M...
air densityaltitudederatingfire suppressiongensethigh altitude data centerNPSHUPS
RTX 5090 racks at 575 W per card: air cooling tops out near 15-20 kW/rack at PUE ~1.55, warm-water direct-to-chip liquid runs 40 kW+ at PUE 1.15-1.20. Full 1 MW pod math: ~3.06 GWh and ~$306k saved per year.
air coolingdata center coolingGPU clusterliquid coolingPUERTX 5090
Container data center shells live or die by their paint. The application process - spray parameters on corrugated panels, stripe coats, recoat windows - sets the starting quality; the washdown, inspection grading (ASTM D610/D714), and spot-repair rhythm dec...
container data centercorrosionISO 12944maintenanceprotective coating
Field welding requirements for outdoor cooling tower and condenser-water piping: ASME B31.9, ASME Section IX qualifications, fit-up tolerances, galvanized coating removal and A780 repair, cold-weather preheat, spot RT and the 1.5x hydro test.
A reproducible two-year ROI model for US GPU compute rental: the H100/B200 rate ladder, $0.49 per GPU-hour of real operating cost, utilization sensitivity, and the residual-value debate that decides the return.
AI infrastructureB200colocationcompute economicsGPU cloudGPU rentalH100ROI
Stage-by-stage working principle of the solid-state transformer - cascaded H-bridge rectifier, dual active bridge isolation, direct 800 VDC output - with the Faraday arithmetic, chain efficiency, capex and the honest open problems.
800 VDCAI factorydata center powerHVDCpower distributionSiCsolid-state transformerSST
Why 54 V racks hit a wall at 200 kW, what the 800 VDC chain changes between grid and GPU, and the arithmetic behind the 5% efficiency, 45% copper, and 70% maintenance claims - plus the four problems it leaves unsolved.
800 VDCAI factorydata center powerHVDCKyberNVIDIApower distributionRubin Ultra
ISO Class 8 particulate limits, ANSI/ISA-71.04 G1 gaseous limits, and the five ways contamination kills servers: heat sink fouling, zinc whiskers, creep corrosion, fibre end faces, and filter bypass. With computed filtration and energy numbers.
air qualitycontamination controlcreep corrosiondata center filtrationISO 14644MERV filtrationzinc whiskers
ANSI C84.1, the ITIC curve, and IEEE 519 define clean power on three time scales. Harmonic spectra, K-factor arithmetic, neutral sizing, and the mitigation toolbox for AI-era halls.
ATS vs STS in data centers: where each transfer switch belongs in the power chain, why an STS needs two live sources, what the 4 ms transfer means against the ITIC window, and the SCR loss the ATS never pays.
AI data centerATSNFPA 110power distributionSTSTier IIItransfer switchUL 1008
What to run on a GPU server before it carries production work: DCGM diagnostic levels, thermal soak, XID and ECC acceptance limits, NCCL bus bandwidth targets, and the exit criteria that define a pass.